getting_started:tutorials:sequencer2
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
getting_started:tutorials:sequencer2 [2020/12/03 17:38] – [Subsequence Has Timeout Monitor with Restart] ursgraf | getting_started:tutorials:sequencer2 [2021/03/31 15:32] – [Subsequence Has Timeout Monitor] ursgraf | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Example with Blocking Sequence ====== | ====== Example with Blocking Sequence ====== | ||
The following example all have a main sequence which calls a few steps and a another sequence. This second sequence is a blocking sequence. That means that the main sequence pauses while the second sequence runs. A timeout monitor either supervises the main sequence or the second sequence. | The following example all have a main sequence which calls a few steps and a another sequence. This second sequence is a blocking sequence. That means that the main sequence pauses while the second sequence runs. A timeout monitor either supervises the main sequence or the second sequence. | ||
- | ===== Main Sequence | + | ===== Main Sequence |
- | In the EEROS library you will find a directory with examples. Open a shell in the build directory of your EEROS library and run | + | In the EEROS library you will find a directory with examples. |
+ | Open a shell in the build directory of your EEROS library and run | ||
< | < | ||
$ ./ | $ ./ | ||
Line 14: | Line 15: | ||
===== Main Sequence Has Timeout Monitor ===== | ===== Main Sequence Has Timeout Monitor ===== | ||
- | A next example demonstrates what happens if the main sequence is interrupted by a monitor while a subsequence is called. Run | + | The next example |
< | < | ||
$ examples/ | $ examples/ | ||
Line 26: | Line 27: | ||
===== Main Sequence Has Timeout Monitor with Resume ===== | ===== Main Sequence Has Timeout Monitor with Resume ===== | ||
- | A next example demonstrates what happens if the main sequence is interrupted by a monitor while a subsequence is called. Run | + | The next example |
< | < | ||
$ examples/ | $ examples/ | ||
Line 38: | Line 39: | ||
===== Main Sequence Has Timeout Monitor with Restart ===== | ===== Main Sequence Has Timeout Monitor with Restart ===== | ||
- | A next example demonstrates what happens if the main sequence is interrupted by a monitor while a subsequence is called. Run | + | The next example |
< | < | ||
$ examples/ | $ examples/ | ||
Line 49: | Line 50: | ||
===== Subsequence Has Timeout Monitor ===== | ===== Subsequence Has Timeout Monitor ===== | ||
- | A next example demonstrates what happens if the subsequence is interrupted by a monitor. Run | + | The next example |
< | < | ||
$ examples/ | $ examples/ |
getting_started/tutorials/sequencer2.txt · Last modified: 2021/03/31 15:33 by ursgraf